北极赛车qq群

Welcome to the website of Nanchang Urban Construction Investment Group!

Engineering project

South extension project along Jiangnan Avenue

作者:佚名 日期:2014年04月21日 Source: Unknown Author: Anonymous Date: April 21, 2014
The project starts from the Shengmi Bridge (Changnan Avenue) in the north and is arranged along the east side of the dyke of the Gandong embankment to the south to the South Outer Ring Expressway with a total length of about 10.5 kilometers. It consists of two major systems, the express main road and the auxiliary road in the east. There are six separate interchanges and eleven pedestrian bridges in this phase. The construction content includes: roads, bridges, drainage, electrical, greening, transportation facilities and other projects.
Project progress: The project's planning plan has been approved, and the project approval and site selection opinions have been obtained. Flood prevention, environmental assessment, and special reports on water conservation are all in the preparation and approval stage. Expert review meetings for feasibility reports have been organized.
The total estimated investment is RMB 146,412,900, of which RMB 97,758,500 is the engineering cost, RMB 37,807,900 is the other cost of the project construction, and RMB 10,845,360 is the basic reserve fee.
The project is scheduled to start in September 2014 and open to traffic in September 2016.

Group Profile | Contact Us | Electronic Journal | Site Navigation

website
正规棋牌游戏平台 状元棋牌 电玩城游戏大厅 网上棋牌手游大全 九五至尊网站是多少 电子捕鱼平台 胜博发娱乐游戏 中文电子游戏官网 上游棋牌大厅下载 最火的捕鱼游戏