北极赛车qq群

Welcome to the website of Nanchang Urban Construction Investment Group!

Engineering project

Brief introduction of supporting project of West Railway Station

作者:佚名 日期:2012年12月18日 Source: Unknown Author: Anonymous Date: December 18, 2012


1. The taxiway project is constructed on the east and west sides of the underground exit floor of the West Passenger Station in Nanchang. The total lane width is 10 meters, the net height is 5.5 meters, and the length is about 373.5 meters. The total construction area is 13,087 square meters.
2. The project of the underground connection channel of the North-South Square of West Passenger Station in Nanchang (Baishu East Road, Baishu West Road passing through Nanchang West Passenger Station Frame Bridge) project, among which: the Baishu West Road Frame Bridge (D2K1451 + 440) is 14.2M along the line and the length of the axis It is 251.22M, the top area of the box is 3567.30M²; the length of the Baishu East Road Frame Bridge (D2K1452 + 000) along the route is 14.2M, the axis length is 250.22M, and the top area of the box is 3553.10M². The total construction area of the two underground communication passages is 7120.40M².

Group Profile | Contact Us | Electronic Journal | Site Navigation

website
正规棋牌游戏平台 状元棋牌 电玩城游戏大厅 网上棋牌手游大全 九五至尊网站是多少 电子捕鱼平台 胜博发娱乐游戏 中文电子游戏官网 上游棋牌大厅下载 最火的捕鱼游戏