Brief Introduction to the Comprehensive Development Project of the First Phase of the Lehua District Water Conservancy Construction Project in the Changjiang River and the Ganjiang River District around Poyang

作者:佚名 日期:2012年12月18日 Source: Unknown Author: Anonymous Date: December 18, 2012

The water conservancy construction project (Phase 1) around the Poyang Lake, Hunan and Ganjiang Rivers is based on the development group of the Economic Development District Government as the framework, cuts through the construction and improvement of water conservancy facilities, and promotes the construction of surrounding infrastructure to reduce Loss of water damage, improvement of the water environment and ecological environment of the region, and further promotion of land development and economic development in the region.
The total planned area of the project is approximately 36,261 acres (water-bearing area). The construction content mainly includes: (1) Ganjiang regional water conservancy construction projects, including the happiness of embankment enhancement and reinforcement works, new flood control roads, and reconstruction and expansion of power drainage stations. Works, sluice reconstruction works, river dredging and improvement works; (2) bridge works, including 16 new bridges in the area; (3) sewage lift pumping stations and sewage treatment supporting facilities works (4) soil and water conservation works (5) 100,000 tons of supporting water supply facilities (6) The site is level.
The total investment of the first phase of the project is about 8.8 billion yuan. The construction unit will raise 2.8 billion yuan by itself and raise 6 billion yuan from the bank. The construction period is two years.