北极赛车qq群

Welcome to the website of Nanchang Urban Construction Investment Group!

News center

Current position: Current position: Nanchang Urban Construction Investment Group > Information Center > Project News > View Article

Nanchang Changnan Avenue Expressway Reconstruction Project (Shengmi Bridge to Changdong Avenue) Water Conservancy Project Final Acceptance Tendering Announcement

作者:熊克强 日期:2019年09月25日 Source: On the basis of the company: Xiong Keqiang Date: September 25, 2019

招标目的 、计划招标时间等 I. Contents of bidding project, purpose of bidding , planned bidding time, etc.

南昌市昌南大道快速路改造工程(生米大桥至昌东大道)水利项目验收终检。 1. Name of the bidding project: Nanchang Changnan Avenue Expressway Reconstruction Project (Shengmi Bridge to Changdong Avenue) Water Conservancy Project Final Acceptance Inspection.

2. Basic information of the bidding project

- 昌东大道)快速路改造工程位于南昌市南侧,西起生米大桥东端的沿江南大道、东至昌东大道,改造道路长度约 13.303km The Changnan Avenue (Sangmi Bridge - Changdong Avenue) expressway reconstruction project is located on the south side of Nanchang City, starting from the east end of the Shengmi Bridge along Jiangnan Avenue and east to Changdong Avenue. The length of the reconstructed road is about 13.303km . 新建 3 处防洪子堤,分别为抚生路子堤、桃花路子堤和金沙二路子堤;接长 4 座建筑物,分别为桃花闸、朝阳闸、昌南闸和五干渠闸;新设 1 座迎宾北大道节制闸。 The bidding scope for the final inspection of the quality of the special water conservancy project is to build 3 new flood control sub-dikes, including Fusheng Road Sub-dikes, Taohua Road Sub-dikes, and Jinsha Second Road Sub-dikes; four buildings will be extended , including Taohua Gate, Chaoyang Gate, Chang South gate and Wuganqu gate; a new control gate on Yingbin North Avenue was newly established .

目的 3. Purpose of Tendering

( 生米大桥 - 昌东大道段 ) 快速路改造工程水利专项工程的竣工验收质量抽样检测工作。 The quality inspection work for the completion and acceptance of the special water conservancy project of the expressway reconstruction project of Changnan Avenue ( Sangmi Bridge - Changdong Avenue Section ) .

2019 9 25 日至 9 29 日;现场开标时间及地点为 2019 9 30 日上午 9:30 分在南昌城投基础设施开发有限公司(沿江快速路与芳湖路交叉路口)一楼小会议室。 4. Planned time for bidding: The time for bidding announcement and collection of bidding documents is from September 25 to September 29 , 2019 ; the time and place for the on-site bid opening is 9:30 am on September 30 , 2019 in Nanchang City Investment Infrastructure Development Co., Ltd. (the intersection of Yanjiang Expressway and Fanghu Road) on the first floor.

5. Term requirements: from the date of signing the contract to the date of completion of the project.

Second, the requirements for the bidding project partners

1. Certificate of qualification level for quality inspection unit of hydraulic engineering (Grade B geotechnical engineering, Grade B concrete engineering)

、在人员、技术、设备、资金等方面具有相应的能力; 2. Have corresponding ability in personnel, technology, equipment, funds, etc .;

 

、独立完成过类似项目的终检工作; 3. Independently completed the final inspection of similar projects;

4. The final inspection report issued meets the relevant national requirements.

Requirements for Submitting Bidding Documents

1. Need to submit qualification information

Serial number

What to submit

1

A copy of the latest company certificate (business license, qualification certificate of inspection and testing agency, and quality certificate of water testing unit) with the latest annual inspection,

2

Legal representative's and agent's ID copy, power of attorney

3

Basic information and qualifications of the project leader, technical director, and project personnel

4

Similar project performance contracts.

5

要求以附件形式提供 ) Phone and email address of the contact person ( required to provide as attachment )

提交方式与资料密封要求:资质资料与报价单分开密封同时提交;投标主题请写:南昌市昌南大道快速路改造工程(生米大桥至昌东大道)水利项目验收终检投标资料( XX 公司)。 2. Submission method and data sealing requirements: Qualification materials and quotations are sealed and submitted at the same time; the subject of the bidding should be written: Nanchang Changnan Avenue Expressway Reconstruction Project (Shengmi Bridge to Changdong Avenue) Water Conservancy Project Acceptance Final Inspection Bidding Information XX ).

Fourth, the bid control price

The maximum price limit for bidding for this project is RMB   13.20   Ten thousand yuan.

V. Site survey

The bidder may conduct surveys on the construction site and the surrounding environment on his own, and the expenses incurred in surveying the site shall be borne by the bidder himself.

Explanation of Bidding Documents

3 日内以书面形式向招标人提出,招标人将以书面形式予以解答,并将书面答复发放到所有投标人。 1. After receiving the bidding documents, if the bidder has any questions that need to be clarified, it shall be submitted to the bidder in writing within 3 days after receiving the bidding documents . The bidder will answer in writing and issue written responses to all bidder.
2. The right to interpret the bidding documents belongs to the bidder.

7. Margin

2 00 0 元投标保证金,各投标人保证金经招标人核实后进行现场密封保管。 1. The bidder shall submit a bidding deposit of RMB 2000 at the same time as submitting the bidding documents . The bidder's deposit shall be sealed and kept on-site after verification by the bidder.

2. Unbid bidders will be returned on the spot after the bid opening is completed.

3. The winning bidder's bid deposit shall be returned within five days after the contract is formally signed with the bidding unit (interest-free).

Eight methods of bid evaluation

1. Qualification review: Qualification review is performed on the documents delivered to bidders on time. Bidders who meet the requirements of the bidding documents participate in the bid evaluation, and bidders who do not meet the requirements of the bidding documents cannot participate in bid evaluation.

2. Quotation evaluation: The bidders who meet the requirements are counted. The lowest bidder is the successful bidder. When the lowest quotation is the same, the second round of quotation will be performed by all the lowest quotation units on site. When the lowest quotation has only one unit, the unit is the winning unit.

合同签订及付款 Nine, contract signing and payment

1. The contract is in the form of a total price contract and is not adjusted in any way.

2. Complete the inspection and issue the inspection report and pay the contract sum in a lump sum after being filed by the quality inspection department.

、招标项目联系人 X. Contact Persons for Bidding Projects

1. Contact person for bidding project: Xiong Keqiang

13879116455 2. Contact information: 13879116455

 

 

Bidding unit: Nanchang Urban Investment Infrastructure Development Co., Ltd.

2019 9 25 Announcement time: September 25 , 2019


Group Profile | Contact Us | Electronic Journal | Site Navigation

website
正规棋牌游戏平台 状元棋牌 电玩城游戏大厅 网上棋牌手游大全 九五至尊网站是多少 电子捕鱼平台 胜博发娱乐游戏 中文电子游戏官网 上游棋牌大厅下载 最火的捕鱼游戏